Plant Design, Supply, Installation, Testing and Commissioning for Upgr… Tender | Bidnexis
Open Energy, Power & Electrical Parastatal 🇹🇿 Tanzania

PLANT DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING FOR UPGRADE & EXTENSION OF 132/33 KV KYAKA SUBSTATION TO

Sign up free to view company Subscribe to view ref Published 21 Sep 2026 81 views 194 downloads
Tender Overview

SPECIFIC PROCUREMENT NOTICE PLANT DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING FOR UPGRADE & EXTENSION OF THE 132/33 KV KYAKA SUBSTATION TO 220/132/33 KV - LOT 2 IFB Number · TR212/2025/2026/W/05 · Employer · Tanzania Electric Supply Company Limited (TANESCO) · Project · KAKONO Hydropower Project · Contract title · Plant Design, Supply, Installation, Testing and Commissioning for Upgrade & Extension of the 132/33 KV Kyaka Substation to 220/132/33 KV - Lot 2 · Country · United Republic of Tanzania · Loan No. /Credit No. / Grant No. · ADB: 20003000000251 & AFD: CTZ 1068 01 U and CTZ 1…

Full description, requirements, and documents available after sign-in.
Quick Summary · 30-second read
Sign up free to summarize

Get the key facts — what is required, who can bid, documents, deadlines and how to submit — without reading the whole tender.

AI summary of this tender's text only. Always confirm details in the full tender before bidding.
🔒

Sign in to read the full tender

Create a free account or sign in to access full tender details, eligibility requirements, and documents.

Documents (1)
  • Tender Advert
    Official notice

Closes In

Nov 23, 2026

Key Details
Tender Ref Sign up free to view
Closing Date Nov 23, 2026
Published Sep 21, 2026
Submission physical
Category Energy, Power & Electrical
Sector Parastatal
Country 🇹🇿 Tanzania
Feature This Tender

Put this tender in front of 10,000+ qualified suppliers across Africa. Featured tenders appear at the top of every listing and carry a visible Boosted badge for maximum visibility.

Top
Placement
Boosted
Badge
Priority
Alerts
Contact Us to Feature

We'll confirm availability and set up your boost within 24 hours.

Chat with VERA