The procuring entity HES-TECH 04/2627 THE SUPPLY, DELIVERY AND INSTALLATION OF RENEWABLE ENERGY INFRASTRUCTURE ON AN AS AND WHEN REQUIRED BASIS FOR A PERIOD OF THREE (3) YEARS PART C2.3: LEVELISED COST OF ENERGY (LCOE) EVALUATION C2.3 LEVELISED COST OF ENERGY (LCOE) EVALUATION C2.3.1 GENERAL The Employer shall evaluate the price component of the Tender by calculating the Levelised Cost of Energy (LCOE) of prescribed reference renewable energy systems using the Tendered Rates entered in Pricing Schedules A to D. The calculations shall be performed automatically within the Employer-issued Micros…
Get the key facts — what is required, who can bid, documents, deadlines and how to submit — without reading the whole tender.
Create a free account or sign in to access full tender details, eligibility requirements, and documents.